Cracks controlling for mass concrete of main pier pile caps of Jiashao bridge
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    According to the case that mass concrete of the main pier pile caps of Jiashao bridge is easy to crack in construction, because of the enormous section size, slow heat dissipation, easily inducing high inner-outer temperature difference, strong constraint of bottom concrete and piles, and it is difficult to repair the cracks on the pile are, because that the pile caps are all underwater, we design the standard of temperature controlling on the basis of simulated result of temperature and thermal stresses distribution of mass concrete. By taking some temperature control measures, such as controlling pouring temperature of concrete, applying recycling cool water, insulated and humidity curing, and controlling the quality of concrete, harmful cracks don’t appear in the main pier pile caps of Jiashao bridge and anticipated controlling effect is achieved.

    Reference
    Related
    Cited by
Get Citation

张洪波,陈 胜,秦明强,房艳伟.嘉绍大桥主墩承台大体积混凝土裂缝控制[J].水运工程,2012,(8):183-186

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 22,2012
  • Published:
Article QR Code