    Based on the foundation treatment construction of Tangshan Caofeidian coal terminal construction project, this paper expounds the construction technology and consolidation effect of dynamic compaction method,HDVM method, preloading drainage consolidation method + HDVM, HDVM replacement method, etc., and carries out a comparison among them. The results showed that according to different geological conditions and soil distributions under the filling ground, and using different foundation treatment methods, we can improve the foundation bearing capacity significantly and thus meet the needs of the site construction, and provide a reference for the construction of similar projects.

    Reference
    Related
    Cited by
Get Citation

朱颖波,王 中,陈明杰.多种地基处理方法在曹妃甸煤码头续建工程的应用[J].水运工程,2012,(8):172-176

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: August 22,2012
  • Published:
Article QR Code