Analysis of monitoring data of displacement and settlement in the process of embankment construction
DOI:
CSTR:
Author:
Affiliation:

Shanghai Waterway Engineering General Contracting Co., Ltd., Shanghai 200120, China

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This article explores the laws of displacement and settlement during construction of the riprap embankment based on the analysis of the monitoring data of the construction. The loading rate and the layered loading height shoud be under control in the process of the dyke construction. It is feasible to control the loading speed and layered loading height. Measures such as decreasing the loaded height, loading on both sides of the dyke simultaneously, timely following of apron rockfills and extending the time of permanent load should be taken to make sure the effective and safe dyke construction.

    Reference
    Related
    Cited by
Get Citation

顾 帅.抛石围堤施工期间位移沉降规律分析[J].水运工程,2012,(6):192-195

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: June 20,2012
  • Published:
Article QR Code