Optimiziation design on jetty plan of EPC power plant project in Indonesia
DOI:
CSTR:
Author:
Affiliation:

CCCC Second Harbor Consultants Co., Ltd., Wuhan 430071, China

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In the design of a jetty for an EPC power plant project, considering comprehensively the local factors such as wind, wave, currents, sediment movement, topography, geology and construction conditions to optimize the plan of jetty and breakwater, we create sufficient condition for the profit of the contractor. The designed scheme recommended is convenient for construction and saves investment, and may serve as a reference for similar projects.

    Reference
    Related
    Cited by
Get Citation

张翠莹,谢 勇,王君辉.印尼某EPC电厂项目码头平面布置优化[J].水运工程,2012,(6):110-114

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: June 20,2012
  • Published:
Article QR Code