Key problems in Penglai Jutao 50 000 DWT slideway construction and wharf renovation
DOI:
CSTR:
Author:
Affiliation:

1. CCCC Second Harbor Consultants Co.,Ltd., Wuhan 430071, China;2. Penglai Jutao Offshore Engineering Heavy Industries Co., Ltd., Penglai 265609, China

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Concerning Penglai Jutao No. 1 slideway construction, this paper analyzes the construction schemes from the construction l difficulty degree, structure force, pile foundation test and engineering cost,etc., summarizes the advantages and disadvantages of the schemes, discusses problems encountered during the transformation of the gravity caisson wharf to the marine heavy wharf and countermeasures to serve as a reference for similar engineering.

    Reference
    Related
    Cited by
Get Citation

王安龙 ,梁丰收,李成升,万 谦.蓬莱巨涛5万吨级滑道建设及码头改造中关键问题的处理[J].水运工程,2012,(6):102-109

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: June 20,2012
  • Published:
Article QR Code