Abstract:Concerning Penglai Jutao No. 1 slideway construction, this paper analyzes the construction schemes from the construction l difficulty degree, structure force, pile foundation test and engineering cost,etc., summarizes the advantages and disadvantages of the schemes, discusses problems encountered during the transformation of the gravity caisson wharf to the marine heavy wharf and countermeasures to serve as a reference for similar engineering.