Instability form of breakwater and revetment on soft ground treated by explosive compaction
DOI:
CSTR:
Author:
Affiliation:

1. Ningbo Kening Blasting T. & E. Co., Ltd., Ningbo 315040, China; 2. Beijing Jiaotong University,Beijing 100044, China

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This paper summarizes common sections of the breakwater and revetment on soft ground treated by explosive compaction, analyzes two kinds of instability forms, i.e. overall instability and local instability, together with the causes, and discusses measures ensuring the stability of the breakwater from both design and construction.It is concluded that it’s crucial to ensure the breakwater to fall to the design elevation and form complete underwater platform for preventing the breakwater’s instability, while suitable construction method and process controlling are important guarantees of the stability.

    Reference
    Related
    Cited by
Get Citation

王 健, 吴京平, 刘伟庆, 孙学军,李 涛.爆炸挤淤防波堤、护岸堤身失稳形式*[J].水运工程,2012,(6):48-51

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: June 20,2012
  • Published:
Article QR Code