Reinforcement design and control measures during construction of landslide-revetmen
DOI:
CSTR:
Author:
Affiliation:

Guangzhou Branch, CCCC Second Harbor Consultants Co., Ltd., Guangzhou 511442, China

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In order to reinforce the landslide-revetment of Zhoushan COSCO Shipyard No.1 berth which is in an unstable state, not only the design schedule is taken into consideration, but also the probablely adverse influential factors are analyzed. To ensure the stability of revetment during construction period, various available control measures are taken based on real-time monitoring data.

    Reference
    Related
    Cited by
Get Citation

杨璧榕,李 丹.滑坡失稳护岸的加固设计与施工控制措施[J].水运工程,2012,(5):152-156