Design features and details of airport passenger terminal
DOI:
CSTR:
Author:
Affiliation:

Guangzhou Branch, CCCC Second Harbor Consultants Co., Ltd., Guangzhou 511442, China

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Taking Shenzhen airport relocation project as a study case, this paper expounds the plan layout,technological scheme and wharf structure design of the port. In view of the ship type characteristics and the detail problems in operation of No.1 finger pier of Shenzhen airport passenger wharf, and considering the optimization design of No.2 finger pier’s structure, this paper presents a summarization and analysis of related problems and special utilization requirements, to serve as a reference for similar engineering designs.

    Reference
    Related
    Cited by
Get Citation

闫淑英, 丘小标.机场客运码头设计的特点及几个细节问题[J].水运工程,2012,(5):121-124

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: June 19,2012
  • Published:
Article QR Code