Piling penetration control in Singapore marine works
DOI:
CSTR:
Author:
Affiliation:

The Third Co., Ltd. of CCCC Third Navigation Engineering Bureau, Nanjing 210011, China

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In piling works, both the type of the piling hammer and the driven ability of the pile are related to the penetration. Thus the penetration controlling shall be studied. Taking the Piers, Wharves & Ancillary Work at Changi East-Phase 4, Singapore as an example, we study the penetration calculations and controlling methods for pile driving and the discuss the verification and improvement measures. The analyzing result shows that the penetration calculation in piling construction provides a direct and effective method for reasonable selection of driving hammer and control of penetration both at home and abroad.

    Reference
    Related
    Cited by
Get Citation

徐立新.新加坡海工工程沉桩贯入度控制的研究与应用[J].水运工程,2012,(4):180-185

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: April 23,2012
  • Published:
Article QR Code