Development conditions and schedule of north channel at Yangtze estuary
DOI:
CSTR:
Author:
Affiliation:

Shanghai Waterway Enginering Design and Consulting Co., Ltd., Shanghai 200120, China

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Proper development of the north channel will reduce the navigation pressure of the south channel, smooth the Yangtze waterway, and broaden the coastline application at the Yangtze estuary. By analyzing the development conditions of the north channel, we research the development scale and schedule of it. It is concluded that at the present stage, we may regulate the north channel and construct a 5 000 DWT channel with the natural water depth so as to reduce partially the navigation pressure; In the near future, we can develop the 8m-deep-water channel and realize navigation of 20 000 DWT ships; As for the mid & long term, we shall regulate the north channel comprehensively and develop a 10 m-deep channel to satisfy the navigation of 30 000 DWT ships.

    Reference
    Related
    Cited by
Get Citation

楼 飞,阮 伟.长江口北港航道开发条件评价及开发时序探讨[J].水运工程,2012,(4):111-116

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: April 23,2012
  • Published:
Article QR Code