CCCC Second Harbor Consultants Co., Ltd., Wuhan 430071, China
Clc Number:
Fund Project:
Article
|
Figures
|
Metrics
|
Reference
|
Related
|
Cited by
|
Materials
|
Comments
Abstract:
Design points of the trestle wharf includes: determination of rail top elevation for bridge crane;determination of the clearance height of track beam; study on the arrangement of guiding jetty; study on the berthing and operating width. This paper analyzes the design points and gives the design basis and calculation formula.