    Abstract:

    Focusing on the soft foundation and adjacent first phase project restrictions of the second phase levee project of Baogang Majishan port, this paper conducts levee ground treatment and upper structure study, to probe in to the levee options selection, sand pile foundation treatment, confronting thick middle sand layer design and levee connection section design between different ground treatment methods.

    Reference
    Related
    Cited by
Get Citation

黄晋申,刘家才.宝钢马迹山港二期工程围堤设计关键技术[J].水运工程,2012,(3):73-77

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: March 22,2012
  • Published:
Article QR Code