Comparative study on water transportation cost before and after impoundment of the Three Gorges project
DOI:
CSTR:
Author:
Affiliation:

Changjiang River Administration of Shipping Affairs of MOT, Wuhan 430014, China

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    By the contrastive methods, this paper analyzes the change of the channel condition in the upriver and middle reaches of the Yangtze River before and after the impoundment of the TGP, and calculates the shipping cost of the ship route from Chongqing to Yichang, based on the representative ships. It is concluded that the water transportation cost and oil consumption are decreased obviously, and it is suggested to speed up the channel regulation and ship types standardization to improve the traffic capacity of the Three Gorges project.

    Reference
    Related
    Cited by
Get Citation

郭 涛.三峡工程蓄水前后水运成本比较研究[J].水运工程,2012,(2):25-29

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: March 21,2012
  • Published:
Article QR Code