Stabilizing of pile under condition of steep slope and bare bedrock
DOI:
CSTR:
Author:
Affiliation:

Ningbo Branch of CCCC Third Harbor Engineering Co., Ltd., Ningbo 315200, China

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    To solve the problem of pile stabilization in the dock steep slope bare rock area, we carried out routine artificially flattened bed dumping, and the exploratory construction for the catheter frame pile stabilization process. We solved the technical problems such as pile stabilization temporary reinforcement, the construction study of catheter frame technology, and the positioning, ascension, solid, sinking of pile on site, according to different geologic conditions, and provided a referential basis for the pile stabilizing technology under the same kind geologic condition.

    Reference
    Related
    Cited by
Get Citation

潘一强.陡坡及基岩裸露地质条件下的稳桩工艺[J].水运工程,2012,(1):179-182