Navigation during regulation of tail water level of Shuikou hydroelectric station
DOI:
CSTR:
Author:
Affiliation:

1. School of River & Ocean Engineering, Chongqing Jiaotong University, Chongqing, 400074, China;2. East China Investigation and Design Inst., Hangzhou 310014, China

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The regulation of the tail water level of Shuikou hydroelectric station will need at least 3.5 years. Based on the arrangement conditions of water level treatment hinge and navigation conditions of the construction reach, through theoretical analysis and model experiment, we propose the navigation guaranteeing measures which combine waterway dredging, reef explosion for barrier clearance with scientific station dispatch. The results indicate that the navigation reliability is lower in the partly time intervals of the two dry seasons, during the construction time of second and fourth stage cofferdam. However, during other construction periods, the navigation reliability is more than 85%. The navigation measures are proposed to ensure the shipping in Minjiang river is unimpeded during construction.

    Reference
    Related
    Cited by
Get Citation

陈野鹰,扈晓雯,彭 凯.水口坝下水位治理工程施工期通航研究[J].水运工程,2012,(1):83-87

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: January 18,2012
  • Published:
Article QR Code