Design of marine power supply system for Shekou container terminal
DOI:
CSTR:
Author:
Affiliation:

CCCC Water Transportation Consultants Co., Ltd., Beijing 100007, China

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This paper introduces the design of the marine power supply system from berth No.5 to No.9 in the port area. The frequency of the main ships’ power grids at Shekou port is 60 Hz, with two kinds of distribution voltage, i.e. 6.6 kV and 0.44 kV. The power supply system for the shore considers two voltage levels to meet the demands of different vessels. The plan has a high flexibility and a remarkable effect in energy saving and pollution reduction.

    Reference
    Related
    Cited by
Get Citation

陈晓宏,王 闯.蛇口集装箱码头船用供电系统方案设计[J].水运工程,2012,(1):74-78

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: January 18,2012
  • Published:
Article QR Code