Construction essentials for Fujian coastal open seas port project in the Taiwan Strait
DOI:
CSTR:
Author:
Affiliation:

CCCC Third Harbor Consultants Co.,Ltd., Shanghai 200032, China

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    With the speeding up of the development along the west coast of the Taiwan Strait economic zone,harbor resources’ layout is being reintegrated and adjusted. The infrastructure construction for energy (such as coal,oil, and container) and logistics is in full swing. The west coast of the strait maintains several ports with good sea conditions such as port of Xinghua bay, port of Meizhou bay, port of Quanzhou and port of Xiamen. Nevertheless,open seas’port becomes the development trend of port engineering in consideration of the large-scale trend of marine transportation vessels. As a result of special water conditions, particular construction requirements are involved in the Taiwan Strait port construction projects. The construction experience and conclusions are presented according to recent years’ EPC contract projects in large crude oil terminals and bulk cargo terminals.

    Reference
    Related
    Cited by
Get Citation

徐明飞,何文元.台湾海峡外海港口项目的建设要点[J].水运工程,2012,(1):45-48

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: January 18,2012
  • Published:
Article QR Code