Problems of rapid pile sinking during pile driving and solutions
DOI:
CSTR:
Author:
Affiliation:

Shanghai Waterway Engineering Design and Consulting Co., Ltd., Shanghai 200120, China

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The rapid sinking of pile is a common event during the piling execution at a port, especially the pile driving execution at the soft soil foundation. This paper analyzes the causes of rapid pile sinking and points out relevant problems which may be incurred. If the event of rapid pile sinking is not solved properly, it will result in many defects, such as cracks on pile, pile breaking, etc. Based on the analysis and practical project cases, this paper presents the precautionary measures and countermeasures to be taken for rapid pile sinking. Furthermore, it is prooftested that the solutions have good effects. Therefore, it is hoped that the construction measures and experience be used as references for similar works.

    Reference
    Related
    Cited by
Get Citation

郭生昌,吴少霖.沉桩施工溜桩问题分析及解决措施[J].水运工程,2011,(12):163-166

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: December 21,2011
  • Published:
Article QR Code