Construction process of marine installation technology of semi-circular structure on high foundation
DOI:
CSTR:
Author:
Affiliation:

Shandong Harbor Engineering Group Co., Ltd., Rizhao 276826, China

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In order to solve the angle problem of installing semi-circular structure using crane barges on high foundation, this paper puts forward the innovative technologies of installation, according to the current situation of little experience and a specialized construction equipment. Using double hook-single hook device and joint board to control the installation space, and using a/4 to control the deviation of longitudinal axis correction between adjacent semi-circular structures, we can ensure the construction schedule and construction quality, serving as a reference for similar projects.

    Reference
    Related
    Cited by
Get Citation

杨洪武,张鲁生.弧形岛式防波堤半圆体高基床安装施工工艺[J].水运工程,2011,(12):152-155

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: December 21,2011
  • Published:
Article QR Code