Numerical simulation for construction stage of double-wall steel sheet pile cofferdam in dock
DOI:
CSTR:
Author:
Affiliation:

China Shipbuilding NDRI Engineering Co., Ltd., Shanghai 200063, China

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In order to interpret the real stress characteristic, construction stage of double-wall steel sheet pile cofferdam in dock is simulated by the soft of PLAXIS. The displacement of cofferdam, the internal force steel sheet piles and tie rods, and the safety factors are obtained. The undrained case in the construction stage and the drained case in the serviceable stage are also considered. This numerical analysis results are comprehensive and reflect the limitation of the conventional method. The designers should pay attention to this. This method agrees well with the practical engineering, thus may serve as a reference for similar projects.

    Reference
    Related
    Cited by
Get Citation

江 杰.船坞双排钢板桩围堰施工过程的数值模拟分析[J].水运工程,2011,(12):144-147

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: December 21,2011
  • Published:
Article QR Code