On traffic capacity of Three Gorges lock
DOI:
CSTR:
Author:
Affiliation:

Changjiang River Administration of Shipping Affairs of MOT, Wuhan 430014, China

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    By the structural and contrastive methods, this paper calculates the shipping lock capacity in the late five years on the basis of statistics data, and researches the feasibility of the measures so as to raise the capacity.It is concluded that the potential capacity by means of large-sized ships is limited, and the shipping lock capacity is saturating gradually, so it is difficult to satisfy the growing need of the water transport. It is suggested to optimize the standard ships and initiating the research on the newly-built navigation facilities.

    Reference
    Related
    Cited by
Get Citation

郭 涛.三峡船闸通过能力分析[J].水运工程,2011,(12):112-116

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: December 21,2011
  • Published:
Article QR Code