Control-loaded explosive sludge-extruding displacement method in suspended type dam engineering
DOI:
CSTR:
Author:
Affiliation:
1. Ningbo Kening Explosion Technology Engineering Co., Ltd., Ningbo 315040, China;2. Chongqing Jiaotong University, Chongqing 400074, China
Clc Number:
Fund Project:
Article
|
Figures
|
Metrics
|
Reference
|
Related
|
Cited by
|
Materials
|
Comments
Abstract:
This paper presents the patent technology principle of“control-loaded explosive sludge-extruding displacement method”and mainly introduces the Xuanmen third-phase reclamation engineering construction control and dam detection. Based on the engineering practice on the deep soft soil foundation, it is concluded that the method is economical and feasible. The application of the control-loaded explosive sludge-extruding displacement technique can guarantee the construction quality of the project and control project cost. The design and construction methods and empirical parameters can be used as a reference for future projects.