Application of vibro-compaction in Port Said East Port Container Terminal Phase Ⅱ
DOI:
CSTR:
Author:
Affiliation:

First Company of CCCC Guangzhou Port Construction Co., Ltd., Guangzhou 510500, China

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    According to the CPT results before and after soil improvement using vibro-compaction in three different spaces and the application to the permanent works at Port Said East Container Terminal Phase Ⅱ, the applicability and good effect of this method are introduced. The construction parameters and experience shall be applied to similar projects.

    Reference
    Related
    Cited by
Get Citation

黄国忠,薛展辉.无填料振冲法在埃及塞得东港集装箱码头中的应用[J].水运工程,2011,(11):218-221

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: November 30,2011
  • Published:
Article QR Code