Interaction between slope and pile of ramp and reduction load of pile
DOI:
CSTR:
Author:
Affiliation:

1.CCCC Second Harbor Consultants Co., Ltd., Wuhan 430071, China; 2.Chongqing Jiaotong University,Chongqing, 400074, China;3. CCCC Wuhan Harbor Engineering Design and Research Co., Ltd., Wuhan 430040, China

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In recent years, there have emerged many cases that the pier piles take out a larger deviation of the project due to the backfill for the slope. Combining with a wharf project in the Three Gorges Reservoir area, we analyze the interaction between the bank slope and piles of overhead ramp by the finite element method, discuss how the presence of pile foundation improves the slope stability and how the slope soil deformation impacts the pile foundation, contrast the pile’s inner force and displacement in the pile head free and constrained by a continuous track beam, and reveal that the pile force can be improved and the displacement of pile head can be decreased in the latter case.Based on the engineering projects, we propose two measures to reduce the loads of bank slope pile foundation, which are proved to be effective and rational by the finite element analysis method, and which may serve as a reference for similar projects.

    Reference
    Related
    Cited by
Get Citation

梁丰收, 何光春, 罗建美.岸坡与斜坡道桩基相互作用及桩基减载措施[J].水运工程,2011,(11):211-217

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: November 30,2011
  • Published:
Article QR Code