Design and construction of first oil terminal of Angola
DOI:
CSTR:
Author:
Affiliation:

China Harbor Engineering Corporation, Beijing 100029, China

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Since the implementation in 2008, relying on the project process, safety, quality and benefits, the Angola Oil Terminal has won the confidence of the owner and shown the good image and brand of the company. This paper summarizes the engineering features, design and construction experience, and highlights the importance of technological innovation for implementation of overseas engineering.

    Reference
    Related
    Cited by
Get Citation

李 懿.安哥拉首座成品油码头设计与施工[J].水运工程,2011,(11):164-165

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: November 30,2011
  • Published:
Article QR Code