    Abstract:

    This paper is based on the practice of the removal of steel sheet pile in CSSC Guangzhou Longxue Shipbuilding Co., Ltd., introduces its project profile, construction flow, and equipment choosing overall, summarizes the construction techniques of the removal of the sheet pile and equipment choosing, also concludes the important and difficult points and experience. Relevant theoretical calculation and work practice prove the reasonableness of the construction techniques of the removal of steel sheet piles in the project.

    Reference
    Related
    Cited by
Get Citation

李 伟,袁 昶.船坞坞口围堰钢板桩拔除工艺设计与实践[J].水运工程,2011,(11):38-44

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: November 30,2011
  • Published:
Article QR Code