Key technology for diaphragm wall of Huadian Caofeidian quay
DOI:
CSTR:
Author:
Affiliation:

The First Engineering Co., Ltd. of CCCC Second Harbour Engineering Co., Ltd. , Wuhan 430012, China

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    The first phase of terminal project of Huadian Caofeidian Heavy Equipment Manufacturing Base adopts the diaphragm wall as the main structure of the sheet-pile quay, which is rare in China. Caofeidian area is a newly filling landscape near the sea, with the geology of fine sand and silty sand. The construction of the diaphragm wall is influenced by the tide and construction of the trough is difficult of, the hole is easily to collapse, and the requirement to the wall is strict. This article focuses on the key equipment of Huadian Caofeidian quay project, slot division and joint type selection, foundation treatment, guide wall design, mud and mix engineering, trough detection, hoisting of steel cage, concrete pouring, pipe joints, etc., as well as the control methods for some key technologies, which can ensure the quality of the project and may serve as a reference for similar projects.

    Reference
    Related
    Cited by
Get Citation

王维周,刘 华.华电曹妃甸码头地下连续墙施工关键技术[J].水运工程,2011,(10):149-153

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: November 16,2011
  • Published:
Article QR Code