General layout of Beilun container berth phase Ⅴ
DOI:
CSTR:
Author:
Affiliation:

CCCC Water Transportation Consultants Co., Ltd., Beijing 100007, China

Clc Number:

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This paper explains the major considerations of the general layout of Beilun container harbor berth phase Ⅴ project, such as the natural condition of the project region and the relationship with the adjacent projects, etc. The paper also introduces the overall idea of the general layout of the project and further elaborates the key points of the layout of the dock axis, the width of dock, the bridge approach, the harbor basin, the yard, the assistant region, the container gate, the roadway of harbor district, and the collection and distribution of the port status, etc.

    Reference
    Related
    Cited by
Get Citation

彭玉生,潘金霞,陈 兴.北仑五期集装箱码头工程总体布置[J].水运工程,2011,(9):116-122

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: November 29,2011
  • Published:
Article QR Code