深中通道桥梁下方填筑东人工岛的变形控制关键技术研究
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Key technologies for deformation control of the Eastern Artificial Island reclamation beneath a bridge in ShenzhenZhongshan Link project
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    深中通道项目东人工岛作为隧道与广深沿江高速桥梁的大型互通的基础,其位置位于已建沿江高速桥梁的正下方。沿江高速共有41个桥墩位于岛内,受到人工岛填筑施工影响。为保证沿江高速的正常运营,在施工过程和人工岛完工后桥墩墩顶水平位移控制和竖向位移控制值均要求控制在5 mm以内。针对人工岛建设面临的桥梁变形控制难点,人工岛设计方案中采取了加强岛壁结构基础、设置桥墩隔离保护桩、分区回填及地基处理、合理控制回填高差等关键措施,采用岩土领域通用有限元分析软件midas GTS NX-2017,分析人工岛填土过程和岛壁结构施工过程对桥台变形的影响,并对桥梁沉降和位移进行了实时监测以指导施工,最终顺利在沿江高速桥下形成东人工岛,保证了深中通道的顺利建成和沿江高速的正常运营,对其他工程建设具有一定借鉴意义。

    Abstract:

    The East Artificial Island of the Shenzhen-Zhongshan Link serves as the foundation for the large interchange between the tunnel and the Guangzhou-Shenzhen coastal expressway bridge,and it is located directly beneath the existing coastal expressway.A total of 41 piers of the expressway are situated within the island and are affected by the construction of the artificial island filling.To ensure the normal operation of the coastal expressway,both the horizontal and vertical displacement control values at the pier tops must be maintained within 5 mm during construction and after the completion of the artificial island.In response to the challenges of bridge deformation control during the construction of the artificial island,key measures such as strengthening the foundation of the island-wall structure,setting up isolation protection piles for piers,backfilling in sections with proper foundation treatment,and reasonably controlling the backfill height difference are adopted in the design scheme of the artificial island.The geotechnical finite element analysis software midas GTS NX-2017 is used to analyze the influence of the island filling process and island wall structure construction of the artificial island on the deformation of the abutments.Real-time monitoring of bridge settlement and displacement is conducted to guide the construction process.These measures successfully facilitated the formation of the East Artificial Island under the coastal expressway bridge,ensuring the smooth completion of the Shenzhen-Zhongshan Link and the normal operation of the coastal expressway,which provides reference significance for other engineering constructions.

    参考文献
    相似文献
    引证文献
引用本文

胡鹏,唐一夫,刘强.深中通道桥梁下方填筑东人工岛的变形控制关键技术研究[J].水运工程,2026(4):236-244.