    摘要:

    巢湖闸枢纽位于巢湖入裕溪河口,是合裕线航道和巢湖防洪的关键控制工程;上游紧邻巢湖生态风景名胜区,受生态环保和防洪因素制约,建设条件受限。现状一线船闸技术状态差,不能正常运行,船闸通过能力不能满足运量需求。依据老闸闸室宽度,通过现状不同船宽过闸船舶数量占比分析,提出过闸船舶应根据船宽选择从闸室尺度适应性较好的船闸过闸,尽量提高闸室利用率的运行方案。一线船闸改造后门槛最小水深为4.5 m,通过过闸船舶临界航速分析发现,正常进出闸航速条件下,设计船舶满载时最大吃水可由规范允许值2.80 m提升至2.92 m,满足过闸要求的2 000吨级船舶数量占比可由64.68%提高至83.10%,当航速降低至0.6 m/s时,基本可满足所有2 000吨级船舶过闸。同时从运输经济性角度,通过设计船型对船闸门槛水深与下游航道设计水深匹配性分析,论证了设计船舶最大吃水取值的合理性。

    Abstract:

    The Chaohu Ship Lock Hub is located at the entrance from Chaohu River to the Yuxi River,and is a key control project for the Heyu line channel and Chaohu River flood control.Its upstream is adjacent to the Chaohu ecological scenic area.Due to the constraints of ecological and flood prevention factors,construction conditions are restricted.The current technical condition of the first-line ship lock is poor and cannot operate normally.The throughput capacity of ship lock cannot meet the demand for transportation volume.Based on the width of the old lock chamber and the analysis of the proportion of ships passing through the lock chamber with different widths,it is proposed that the ships passing through the lock chamber should choose the ship lock with better adaptability to the size of the lock chamber according to the width of the ship,and try to improve the utilization rate of the lock chamber as much as possible.After the renovation of the first-line ship lock,the minimum water depth of the threshold is 4.5 m.Through the analysis of the critical speed of the ships passing through the lock,it is found that under normal entry and exit speed conditions,the maximum draft of the designed ship when fully loaded can be increased from the allowable value of 2.80 m to 2.92 m.The proportion of 2,000-ton class ships that meet the requirements for passing through the lock can be increased from 64.68% to 83.10%.When the speed is reduced to 0.6 m/s,it can basically meet the requirements for all designed 2,000-ton class ships to pass through the lock.At the same time,from the perspective of transportation economy,the rationality of the maximum draft value of the designed ship is demonstrated by analyzing the matching between the threshold water depth of the ship lock and the downstream channel design water depth through the design of the ship type.

    参考文献
    相似文献
    引证文献
引用本文

董 霞.巢湖一线船闸改造工程船闸规模论证[J].水运工程,2025(12):122-127.