Evaluation of actual ship seaworthiness of regulation project at Liantuo section waterway between Three Gorges Dam and Gezhouba Dam
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    三峡—葛洲坝两坝间汛期大流量下“四滩一弯一关”水流湍急、流态紊乱,通航水流条件差。基于莲沱段航道整治工程“炸礁+清渣+深沱抛填”方案,通过整治前后水文原型观测与实船适航试验以验证该工程是否达到预期整治目标。通过观测试验河段的水面比降、水深及表面流速等变化分析航道工程整治效果,进而选取3 000和5 000吨级满载船作为试验船舶开展实船适航试验。试验船舶沿设计航线进行上、下水航行,实时测量试验船舶航行轨迹、对岸航速、漂角等航行指标及航行状态。同时,结合整治前后实测资料,对比分析莲沱段航道水文原型观测和实船适航结果,并开展适航性能分析。结果表明:工程实施后河段通航水流条件及船舶航行条件有明显改善,达到了工程预期整治目标。

    Abstract:

    In flood season,between Three Gorges Dam and Gezhouba Dam,the“four beaches,one bend and one pass”of which flow is large,fast and disorderly,and the navigable flow condition is poor.On the basis of the plan of “reef blasting+slag cleaning+ dumping and filling in deep bay”of Liantuo section waterway regulation project,it is verified that whether the project has reached the expected regulation target through prototype hydrological observation before and after and actual ship seaworthiness test after regulation.The effect of engineering regulation is analyzed by observing the changes of surface gradient,water depth and surface velocity in the test reach,and then 3,000-ton and 5,000-ton class fully loaded ships are selected as test ships to carry out real ship seaworthiness tests.The test ships sail on and off the designed route,and the test ships' sailing track,shore speed,drift angle and other sailing indicators and sailing state are measured in real time.At the same time,the results of the prototype hydrology observation and the ship trial in Liantuo section are compared and analyzed combined with the measured data before and after the renovation project,and the seaworthiness performance is analyzed.The results show that the navigable flow conditions and ship navigation conditions of the river reach have been significantly improved after the implementation of the project,and the expected regulation target of the project have been achieved.

    参考文献
    相似文献
    引证文献
引用本文

高 攀,肖玉华,崔健彰,等.三峡—葛洲坝两坝间莲沱段航道整治工程实船适航评价*[J].水运工程,2025(8):99-107.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2025-08-18
  • 出版日期:
文章二维码