平陆运河大型土石方多因子调配模型应用研究
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Application of multi-factor allocation model of large scale earthwork in Pinglu Canal
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    平陆运河大范围土石方运输调配问题在建设项目中,不仅涉及大量的土方开挖、运输和处置,还受许多因素的制约,如地形地貌、交通条件、环境保护要求、施工时间窗口、成本预算等。根据工程实际,通过采用系统论和优化理论构建线性规划模型定义决策变量。明确决策的关键变量,如不同地点的土石方开挖量、运输量、消纳量等。根据工程目标构建目标函数,最小化运输成本、处理成本、时间成本等。利用线性规划求解器对模型进行求解,得到最优的土石方调配方案。在施工过程中,实时收集土石方开挖、运输、消纳的实际数据,迭代反馈与优化。将实测数据与模型预测结果进行对比,分析差异原因,对模型假设与实际情况不符或未考虑到的因素进行优化调整。根据反馈调整模型参数或约束条件,并根据优化后的模型结果,调整施工计划、资源配置,以提高效率和降低成本。该调配模型在运河航道工程中的成功应用,具有重要的理论意义和工程实践价值。

    Abstract:

    The multi-factor allocation model for large-scale earthwork transportation in Pinglu Canal involves not only a large amount of earthwork excavation,transportation,and disposal in construction projects,but also is constrained by many factors such as topography,transportation conditions,environmental protection requirements,construction time windows,cost budgets,etc.A linear programming model is constructed to define decision variables on the basis of engineering practice by systems theory and optimization theory.The key variables for decision-making are clarified,such as excavation volume,transportation volume,and consumption volume of soil and stone at different locations.An objective function is constructed on the basis of engineering objectives to minimize potential costs such as transportation cost,processing cost,and time cost.A linear programming solver is used to solve the model,and the optimal earthwork allocation plan is obtained.Actual data on excavation,transportation,and disposal of earth and stone are collected in real time during the construction process,then measured data collected are iterated feedback and optimized.The measured data are compared with the predicted results of the model,and the reasons for the differences are analyzed.The factors that are inconsistent with the actual situation or not considered are optimized and adjusted.The model parameters or constraints are adjusted on the basis feedback.According to the optimized model results,the construction plan and resource allocation to improve efficiency and reduce costs are adjusted.The successful application of this allocation model in canal and waterway engineering has important theoretical significance and engineering practical value.

    参考文献
    相似文献
    引证文献
引用本文

郭天润,陶诚忠,张海杰,等.平陆运河大型土石方多因子调配模型应用研究[J].水运工程,2025(7):221-226.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2025-07-15
  • 出版日期:
文章二维码