厚覆盖层高水头船闸闸室-省水池布置及地基处理方法*
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:

山东省交通运输科技项目(2017B79);通航建筑物建设技术交通行业重点实验室开放基金资助项目(YT918001)


Layout of lock chamber-water saving basin and foundation treatment method of high head ship lock with thick overburden
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    京杭运河穿黄工程场地覆盖层深厚,上跨方案的渡槽水位与两岸地面高差达30 m以上。针对渡槽两端的高水头船闸多级分散错层式省水池,提出了墙背高填式、墙背低填式两种闸池布置方案。利用ABAQUS软件分别建立平面有限元模型,研究了闸池沉降、闸室底板弯矩在施工期、使用期的全过程时空变化特征,探讨了高填土对闸室的作用机理。结果表明:1)在天然地基条件下,两种布置方案闸池沉降均较大,墙背高填土下曳力、边载产生底板负弯矩,基本上抵消了土压力产生的正弯矩,导致两种方案底板弯矩差异不大,且始终由负弯矩控制。2)地基处理方法是减小闸池沉降、改善闸室受力条件的关键技术问题之一。3)闸室、墙背填土的多桩型组合处理法和基坑外填土的排水固结预压法值得进一步深化研究。

    Abstract:

    The overburden of the Yellow River-crossing scheme of the Beijing-Hangzhou canal is deep,and the water level of the aqueduct of the upper span scheme is more than 30 m above the ground on both sides of the river. Aiming at the multi-level scattered staggered water saving basins of high water head lock at both ends of aqueduct,two kinds of layout schemes of chamber-basin are put forward,which are wall back high fill type and wall back low fill type. We use ABAQUS finite element software to build plane finite element models,research the spatial-temporal variation characteristics of the settlement of the chamber-basin and the bending moment of the floor of the lock chamber during the construction and service periods,and discuss the action mechanism of the high fill on the lock chamber. The results show that:1)Under the condition of natural foundation,the settlement of the chamber-basin in the two layout schemes is relatively large,and the negative bending moment of the floor generated by the drag down force and side load of the high fill on the back of the wall basically counteracts the positive bending moment generated by the soil pressure,which leads to the little difference of the bending moment of the floor in the two schemes and is always controlled by the negative bending moment. 2)The foundation treatment method is one of the key technical problems to reduce the settlement of the chamber-basin and improve the stress condition of the lock chamber. 3)The method of multi-pile combination treatment of lock chamber and wall back filling and the method of drainage consolidation preloading of the filling outside foundation pit are worthy of further study.

    参考文献
    相似文献
    引证文献
引用本文

何良德,王 航,黄 挺,等.厚覆盖层高水头船闸闸室-省水池布置及地基处理方法*[J].水运工程,2022(3):71-77.