三峡工程清水下泄条件下分汊河段控制措施
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Control measures of braided reach under release of clear water caused by Three Gorges project
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    以马家咀水道航道整治一期工程为例,根据支汊控制工程实施前后的实测资料,分析支汊发展的动力条件,从工程与水沙动力条件适应性的角度,对控制工程的效果进行研究,指出工程存在的不足,给出实施后续完善措施的原因,在此基础上,总结汊道治理的经验与认识。

    Abstract:

    The development of branch channel will certainly destabilize the navigation condition in main channel. Hence the restrictive measures on developing branch channels are carried out in recent waterway regulation projects. This paper carries out a comparison study on flow and sediment transport characteristics based on the before and after project observed data in Majiazui channel. The flow dynamic conditions of branch channel development and the effect of the controlling projects are also analyzed from the standing point of the adaptation of river dynamic. Moreover, the deficiency of the Majiazui waterway regulation project and the improvement measures are also presented. The cognitions of branch channel waterway regulation are also summarized based on above analyses.

    参考文献
    相似文献
    引证文献
引用本文

李 明,黄成涛,刘 林,等.三峡工程清水下泄条件下分汊河段控制措施[J].水运工程,2012(10):30-34.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2012-11-02
  • 出版日期:
文章二维码