Abstract:To address the technical challenge in long-distance inland waterway engineering:the adoption of a single central meridian causes excessive projection deformation at both ends of the route,while multi-zone schemes result in inconsistent coordinate systems and difficulty in data connection.Taking the Gan-Yue Canal as the research object,this paper systematically analyzes the differentiated accuracy requirements of projection distortion in the pre-feasibility study,feasibility study,preliminary design and construction drawing design stages,and puts forward a central meridian layout method named “dynamic progression and segmented optimization”. Using Gaussian projection deformation formulas and measured data from different elevation surfaces in the Jiangxi and Guangdong sections of the Gan-Yue Canal,segmented calculations and validations are carried out.The results demonstrate that during the pre-feasibility study stage,a single 114° projection zone yields a deformation of approximately 1/8,800,which meets the requirements for macro-route selection.Starting from the feasibility study stage,the Jiangxi section adopts a central meridian of 115°05′ while the Guangdong section adopts 114°05′,achieving comprehensive projection distortion better than 1/40,000.This satisfies the accuracy requirements of JTS 131-2012 Specifications for Port and Waterway Engineering Survey for large-scale topographic mapping and construction surveying,and realizes effective data connection from macro-route selection to precision construction for long-distance waterway engineering.This strategy can provide technical references for similar trans-basin long-distance waterway projects.