Abstract:In response to insufficient throughput capacity of existing ship locks and difficulties in determining scale and improving efficiency while adding second-line locks under continuously growing freight volume and the trend toward larger,more diversified ship types,a study on optimizing the capacity of multi-line ship locks is conducted.A random scheduling method on the basis of discrete-event simulation is adopted,equating ship lock chamber layout to a two-dimensional bin packing problem.Taking the second-line ship lock project at the Shihutang junction on the Gan River as a case,a simulation model incorporating random vessel arrivals,multi-type vessel combinations,and joint scheduling rules is built,and two scheduling schemes with division of labor by vessel tonnage class are compared.The results show that,the recommended scheme,in which the first-line ship lock handles ships of 1,500 DWT and below,while the second-line ship lock concentrates on 2,000-3,000 DWT and container ships,increases total double-line throughput capacity by 5.8% (in 2035) and 4.6%(in 2050) compared with the scheme where the first-line ship lock passes only ships of 1,000 DWT and below.Rational diversion by ship type combined with simulation-based scheduling can reduce ship lock chamber space waste,and the total throughput capacity exceeds the linear superposition of capacities under random lockage.