Abstract:The Xianggui Canal is an important component of the Han-Xiang-Gui water transport passage within the national high-grade waterway network.Large topographic undulations and stringent ecological constraints existed in the mountain-crossing section.Aiming at the drawbacks of conventional open channel schemes,including massive earth-rock excavation volume,difficult high-slope protection,cultivated land occupation and adverse impacts on the ecological environment,critical elevation analysis,navigation capacity modelling,and technical-economic comparison of multiple alternatives are adopted to investigate the selection of waterway structural types,tunnel layout,navigation capacity calculation and vessel tunnel transit modes.The results show that the tunnel scheme with a critical elevation of 279.3 m reduces earth-rock excavation by approximately 41.44 million cubic meters without occupying cultivated land.For the twin-tunnel scheme,the one-way annual navigation capacities will reach 78.48 million tons and 125.34 million tons in 2040 and 2050,respectively.For the single-tunnel alternating bidirectional navigation scheme,the northbound one-way annual navigation capacities will reach 52.90 million tons and 84.50 million tons respectively.When the electric tractor traction scheme is adopted,a single vessel spends 19.31 minutes passing through the tunnel with a power consumption of 198.25 kW, and navigation safety and efficiency can be guaranteed.The suitable technical scheme for large-scale navigable tunnels in karst areas is clarified in this study,which provides support and reference for engineering construction and the design of similar projects.