Abstract:Aiming at the problem of uncertain matching between waterway capacity and throughput development in the Langyatai Bay operation area of Qingdao Port,caused by shared channels of multi-pier basins and the intensive construction of multiple phases of berths,a simulation study on the navigation adaptability is conducted.A discrete-event dynamic system simulation method is developed to build a multi-constraint simulation model,considering multiple constraints including stochastic ship arrivals,tidal window conditions,day/night navigation rules,and flexible berthing operations.The model is verified using actual production data,and the simulation errors for the number of arriving ships and berthing time are both below 5%.Multi-phase scenarios covering recent intensive berth commissioning,medium-term expansion,and long-term full build-out are simulated.The results show that under all sequences the waterway capacity can meet the projected throughput,waterway utilization ratio remains at a reasonable level,no restrictive congestion occurs,and the system possesses sufficient channel adaptability.With rational scheduling,high-intensity multi-phase development can maintain waterway adaptability.The study results achieve a quantitative assessment of navigation capacity for complex port waterway systems under multi-phase construction sequences,providing decision support for water area planning,construction sequencing optimization,and dynamic resource allocation in large comprehensive port areas.