    摘要:

    依托兴隆枢纽2 000吨级二线船闸工程,提出4种组合支护结构形式,基于土体硬化模型建立深基坑组合支护体系有限元模型,分析对比不同组合支护体系的桩身弯矩、剪力和整体位移。并通过施工组织、资源投入、工效成本等因素分析得到各支护形式的综合评价。结果表明:格形地连墙结构刚度最大,但施工难度大,成本最高。双排钢板桩+钢管桩的优势在于支护结构的整体性和连贯性更好,施工组织和设备调运方便,但面临深厚圆砾层大直径钢管桩插打难题。双排灌注桩+扶壁式挡墙将地连墙工艺优化为灌注桩工艺,成本优势显著。双排灌注桩+钢板桩将挡水和支护分体设计,综合评价最优。由结果可知,现场应用该支护技术后,汛期钢板桩最大变形量198 mm,灌注桩顶最大位移125 mm,斜撑最大轴力172 kN,前排灌注桩最大弯矩为675 kN·m,结构处于安全稳定状态。

    Abstract:

    Four composite support structures are proposed for the 2,000-ton-class second-line ship lock project at Xinglong Junction.Based on the soil hardening model,a finite element model of the deep foundation pit composite support system is established to analyze and compare the pile bending moment,shear force,and overall displacement of different composite support systems.The comprehensive evaluation of each supporting structure is conducted by analyzing factors such as construction organization,resource input,construction efficiency,and cost.The results indicate that the cellular diaphragm wall exhibits the highest structural stiffness,but it is difficult to construct with the highest cost.The double-row steel sheet pile combined with steel pipe piles offers superior integrity and continuity of the support structure,along with convenient construction organization and equipment mobilization,while it faces the challenge of driving large-diameter steel pipe piles in deep and thick gravel layers.The double-row cast-in-place pile combined with a buttress retaining wall optimizes the diaphragm wall to the cast-in-place pile,yielding distinct cost advantages.The double-row cast-in-place pile combined with steel sheet pile adopt a separate design for water cutoff and support,which achieves the best comprehensive evaluation.Field application of this support technique reveals that during the flood season,the maximum deformation of steel sheet piles is 198 mm,the maximum displacement of cast-in-place pile tops is 125 mm,the maximum axial force of inclined support pipe is 172 kN,and the maximum bending moment of front-row cast-in-place piles is 675 kN·m,which verifies the structural safety and stability.

    参考文献
    相似文献
    引证文献
引用本文

任 梦,马锦川,胡 健,等.临江复杂环境下二线船闸基坑支护设计与实践*[J].水运工程,2026(9):230-241.

复制
分享
相关视频

文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2026-09-17
  • 出版日期:
文章二维码