长江上游铁路穿江隧道航段清礁方案研究
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Reef removal scheme for navigation section of railway river-crossing tunnel in the upper Yangtze River
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    根据铁路与航道有关管理要求,针对渝黔铁路长江隧道穿越长江航道猪儿碛滩段需提前实施航道清礁的问题,开展了工程河段远期通航标准、航道清礁方案及施工组织的有关研究。通过将现状船型与三峡水运新通道设计船型相结合的综合分析方法,提出可采用5 000~10 000吨级内河单船和350 TEU集装箱船作为远期代表船型,并确定了6.2 m×150 m×1 000 m的航道建设标准。以航道标准、山区河流浮标漂移安全距离、爆破振动对铁路隧道安全允许距离为基准,提出了纵向以隧道中心线上下游各200 m、横向170 m、水深6.2 m的提前清礁方案,并基于工程区域年内特征水位分析,提出低水南槽、高水北槽的分槽施工方案,有效解决了施工区位于主航槽的施工与通航矛盾问题。研究成果可为渝黔铁路长江隧道炸礁工程实施及类似项目提供技术参考。

    Abstract:

    According to the management requirements for railways and waterways,research has been conducted on long-term navigation standards,waterway reef removal plan,and construction organization,with a focus on the advance reef removal work for the Yangtze River tunnel of the Chongqing-Qianjiang railway,which crosses the Zhu’erqi shoal reach of the Yangtze waterway.Through a comprehensive analysis combining the current ship types with the design ship types for the Three Gorges new waterway,it is proposed that 5,000-10,000 DWT inland single ships and 350 TEU container ships can be used as representative ship types for the long term,and a waterway construction standard of 6.2 m×150 m×1,000 m is determined.Based on the waterway standards,the safe drift distance of buoys in mountainous rivers and the allowable distance for blasting vibration to the safety of railway tunnels,a reef removal plan is proposed,which involves removing reefs upstream and downstream of the tunnel centerline by 200 m in the longitudinal direction,170 m in the transverse direction and with a water depth of 6.2 m.Based on the analysis of the characteristic water levels in the project area during the year,a construction plan for separate channels with the southern channel for low water and the northern channel for high water is proposed,effectively solving the contradiction between construction and navigation in the construction area located in the main navigation channel.The research results can provide technical references for the implementation of the reef blasting project of the Yangtze River Tunnel on the Chongqing-Qianjiang Railway and similar projects.

    参考文献
    相似文献
    引证文献
引用本文

樊书刚,周 璞.长江上游铁路穿江隧道航段清礁方案研究[J].水运工程,2026(8):210-216.

复制
分享
相关视频

文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2026-08-20
  • 出版日期:
文章二维码