    摘要:

    涪江渭沱枢纽位于山区河流急弯河段,针对其扩建船闸上引航道及口门区因受弯道水流及动静水的共同影响导致出现较强斜向水流的问题,采用物理模型及船模试验方法,对上引航道及口门区进行不同布置方案的通航条件研究,提出改善其通航水流条件的工程措施。结果表明,受上游弯道水流的影响,设计方案船闸上引航道及口门区内流速较大,各级通航流量下水流条件均不能满足船舶安全进出船闸;通过增设隔流墙与潜丁坝、开挖引航道对岸河道底高程、平移船闸及调整船闸轴线角度等工程措施,最终修改方案在流量Q≤5 000 m3/s情况下上引航道及口门区各流速指标基本符合规范要求;结合船模试验结果,船舶在流量Q≤5 000 m3/s情况下能够通过上引航道顺利进出船闸。

    Abstract:

    Weituo water control project on the Fujiang River is located in a sharp bend section of a mountainous river.To address the problem that the upper approach channel and entrance area of the expanded ship lock are jointly affected by curved flow and dynamic-static water,resulting in strong oblique flow,we conduct physical model and ship model experiments to study the navigation conditions of the upper approach channel and entrance area under different layout schemes,and propose engineering measures to improve the navigation flow conditions.The results show that due to the influence of the water flow in the upstream bend,the flow velocity in the upper approach channel and its entrance area of the ship lock in the design scheme is relatively large,failing to meet the safety requirements for ships entering and exiting the ship lock under all navigable discharges.Through measures such as adding a division wall and submerged spur dike,excavating the riverbed on the opposite bank of the upper approach channel,translating the ship lock and adjusting the axis angle of the ship lock,all flow velocity indicators in the upper approach channel and area of the final modified scheme basically meet the specification requirements at Q≤5,000 m3/s.Combined with the ship model experiments results,ships can smoothly enter and exit the ship lock via the upper approach channel at Q≤5,000 m3/s.

    参考文献
    相似文献
    引证文献
引用本文

蒲永飞,何进朝,严春浩,等.涪江渭沱枢纽船闸上引航道通航水流条件试验研究[J].水运工程,2026(7):150-158.

复制
分享
相关视频

文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2026-07-17
  • 出版日期:
文章二维码